Bird House Builder
Shopping list
Untreated cedar only: pressure-treated lumber and plywood glues have no place in a nest box. Fence-picket-grade 1×6 cedar is fine; pick a board with the rough side intact, because that rough face goes inside the front so the young can climb out.
| Item | Qty | Each | Total |
|---|---|---|---|
| Cedar 1×6×6 board (¾ × 5½ × 72) | 1 | $5.98 | $5.98 |
| Cedar 1×8×6 board (¾ × 7¼ × 72) (estimated) | 1 | $9.57 | $9.57 |
| 1⅝″ exterior coated deck screws, small box (about 24 needed (or 6d galvanized ring-shank nails)) | 1 | $7.98 | $7.98 |
| 8d galvanized nails, small box (2 pivot nails + 1 latch nail) | 1 | $4.48 | $4.48 |
| 4×4×8 pressure-treated post (set 2′ deep) | 1 | $11.98 | $11.98 |
| Stovepipe predator baffle, 8″ × 24″ (or build one from 8″ duct) | 1 | $35.00 | $35.00 |
| Fast-setting post concrete, 50 lb (8″ hole, 2′ deep (or tamped gravel)) | 2 | $6.48 | $12.96 |
| #10 × 3″ exterior screws (cleat to post) | 4 | $0.35 | $1.40 |
| Total | $89.35 |
Tools: circular saw or miter saw (bevels to 15°), table saw or a guide for the rips, drill/driver, 1½″ hole saw or spade bit for the entrance, ¼″ bit for drain holes, speed square, sandpaper, pencil. A coping saw or chisel helps with the clipped floor corners.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
1×8 × 6′
1 board46% yield1×6 × 6′
1 board57% yieldDimensions follow Cornell NestWatch guidance: interior floor, hole diameter and hole height above the floor matter to the birds; the rest is carpentry. Cedar 1×8 prices are estimated from the 1×6 price you enter. No paint or stain inside, ever.
- 1
Shopping list
Untreated cedar only: pressure-treated lumber and plywood glues have no place in a nest box. Fence-picket-grade 1×6 cedar is fine; pick a board with the rough side intact, because that rough face goes inside the front so the young can climb out.
1×8 needed: the 5″ interior makes some parts wider than a 1×6's 5½″ (back 6½″, front 6½″, roof 7¼″). Buy a cedar 1×8×6, or edge-glue two 1×6 rips with exterior (Titebond III) glue. The 1×8 price is estimated.Item Qty Each Total Cedar 1×6×6 board (¾ × 5½ × 72) 1 $5.98 $5.98 Cedar 1×8×6 board (¾ × 7¼ × 72) (estimated) 1 $9.57 $9.57 1⅝″ exterior coated deck screws, small box (about 24 needed (or 6d galvanized ring-shank nails)) 1 $7.98 $7.98 8d galvanized nails, small box (2 pivot nails + 1 latch nail) 1 $4.48 $4.48 4×4×8 pressure-treated post (set 2′ deep) 1 $11.98 $11.98 Stovepipe predator baffle, 8″ × 24″ (or build one from 8″ duct) 1 $35.00 $35.00 Fast-setting post concrete, 50 lb (8″ hole, 2′ deep (or tamped gravel)) 2 $6.48 $12.96 #10 × 3″ exterior screws (cleat to post) 4 $0.35 $1.40 Total $89.35 Tools: circular saw or miter saw (bevels to 15°), table saw or a guide for the rips, drill/driver, 1½″ hole saw or spade bit for the entrance, ¼″ bit for drain holes, speed square, sandpaper, pencil. A coping saw or chisel helps with the clipped floor corners.
Why 2 boards: parts laid end to end on 72″ boards with 1″ trimmed off each checked end and ⅛″ kerfs. 1 × 1×6 + 1 × 1×8. Expect a short offcut, good for a second box's floor. - 2
Cut list
All parts ¾″ cedar. Rip widths first, then crosscut. Mark the rough face on the front blank: it goes inside. Lengths are to the long point of the 15° bevel.
Tag Part Length Qty Cut A Back 12½″ 1 1×8, rip to 6½″ · top bevel 15° B Floor (clip corners ⅜″ for drainage) 5″ 1 rip to 5″ · square C Side, fixed 11¾″ 1 rip to 5″ · top at 15°, short side 10½″ C2 Side door (pivoting) 11½″ 1 rip to 5″ · top at 15°, ¼″ off the bottom D Front (entrance hole) 11″ 1 1×8, rip to 6½″ · top bevel 15° E Roof 9⅜″ 1 1×8 full width · back edge bevel 15° M Mounting cleat 12¾″ 1 rip to 2½″ · rip to 2½″ - Front: 6½″ wide. Mark the hole center on the centerline, 7½″ up from the bottom edge (6½″ above the floor plus the ¼″ recess and ¾″ floor).
- Side door: take ¼″ off its bottom so it swings free without scraping whatever it's mounted over.
- Floor: clip each corner ⅜″ at 45°. Those four notches are the drain holes.
- 3
Back and floor
Lay the back face down. The floor sits between the sides, ¼″ up from the bottom edge of every wall, so rainwater that runs down the walls drips off instead of soaking into the floor's end grain.
- Set the floor on a ¼″ spacer (a paint stick) on the bench, butt the back against it, centered so ¾″ of the back shows either side, and drive two screws through the back into the floor's edge. Predrill: cedar splits.
- Check the floor's clipped corners are all there; add two ¼″ holes through the floor if you live somewhere wet.
- 4
Sides and the cleanout door
Fix the left side (as you face the front) against the floor's edge, behind the back's overhang: three screws through the back into the side's edge and two through the side into the floor's edge. Keep the wall bottoms flush and the ¼″ floor recess.
The sides' tall end goes to the back.
The right side is the door. Do not glue or screw it. It hangs on two 8d nails, one through the front and one through the back, both on a level line about 1″ below the top of the door (measured at its low end) and ⅜″ in from the outside face, so it pivots outward at the bottom. The door's bottom edge lines up with the floor's underside, ¼″ above the wall bottoms.
- Set the back pivot nail now; the front one goes in with the front.
- Leave the side tops ½″ below the roof line: that gap is the ventilation slot.
Wax or rub a candle on the door edges so it still swings after a season of swelling. - 5
Front and entrance hole
Bore the 1½″ hole before assembly, centered side to side, 6½″ above the floor. Clamp a scrap behind the board and drill from the outside until the pilot pokes through, then finish from the inside so neither face tears out.
- Rough face inside. If both faces are smooth, cut 3–4 horizontal saw kerfs ⅛″ deep under the hole on the inside face, or staple a strip of hardware cloth there, so eastern bluebird fledglings can climb out.
- Screw the front to the fixed side and floor, then drive the front pivot nail into the door edge, lined up with the back nail.
- Height check for eastern bluebird: hole center 6½″ above the floor.
- 6
Roof
One board, its back edge beveled 15° so it sits plumb and flush with the back, 2½″ of overhang past the front. The roof pitches toward the front so the overhang shades the hole.
Center it side to side: ⅜″ of overhang each side.
- Screw down into the front and back only (two each). The sides stay free so the door can swing.
- The ½″ slot between the side tops and the roof is your ventilation; don't caulk it.
- 7
Vents, drainage, latch, finish
- Vent: the gap under the roof along both sides lets hot air out. In hot, sunny yards add two ⅝″ holes high on each side.
- Drain: four clipped floor corners, plus the ¼″ recess. Water in means wet nestlings; they die of cold before they die of anything else.
- Latch: drive one 8d nail through the front into the bottom of the door edge, left proud ½″ so you can pull it with fingers. Swing the door to test.
- Finish: leave cedar bare (it silvers and lasts 10+ years), or a water-based exterior stain in a light color on the outside only. Nothing inside, nothing on or in the entrance hole. No creosote, no dark colors (they overheat).
- 8
Mount on the post with the baffle
For a eastern bluebird: mount the hole 4–6′ up, on a post in open grass or pasture with scattered trees, at least 100 yards from the next bluebird box (pair boxes 5–25′ apart if tree swallows are competing), and away from brushy edges where house wrens live. Face the entrance east or southeast, away from prevailing wind and hard afternoon sun.
- Set the 4×4 post 2′ deep in concrete or tamped gravel and plumb it. Cut the top off so the box's entrance hole ends up about 5′ above the ground (post top 62¼″ above grade).
- Mount the stovepipe baffle (8″ × 24″) on the post with its top just under the box. Snakes and raccoons can't climb past it.
- Screw the cleat to the back, then two 3″ screws through the cleat into the post below the box. Open the door and drive two more through the back into the post from the inside.
Never mount on a fence line or tree when cats or raccoons are around: the baffle only works on a post standing alone, 10′+ from anything they can jump from.
- 9
Done
A 5″ × 5″ box with a 1½″ hole, built for eastern bluebird. Get it up by late winter: eggs from late March into August; 2–3 broods a year.
Leave it empty. Bluebirds build a neat cup of grass or pine needles. Pull the old nest as soon as each brood fledges so they'll re-nest, and once more in late winter. Do not open the box after the nestlings are about 12 days old; it can make them fledge too early.
House sparrows fit through this hole. They're non-native and not federally protected; remove their bulky, trash-filled nests promptly. Starlings are kept out by anything under 1⅝″.
Check the box once a week in season: open the door, look, close it, leave. Parents return within minutes. Report what you see to NestWatch; it's free and it's real science.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
1×8 × 6′
1 board46% yield1×6 × 6′
1 board57% yieldDimensions follow Cornell NestWatch guidance: interior floor, hole diameter and hole height above the floor matter to the birds; the rest is carpentry. Cedar 1×8 prices are estimated from the 1×6 price you enter. No paint or stain inside, ever.