Measure the closet at the floor, the middle and at 84″; walls are rarely parallel. Use the smallest number, minus ¼″, for the top shelf.
Birch or sanded pine ply paints best. Have the store rip the sheets to depth if your saw setup can't, and ask for the narrow offcuts back for the kick and nailers.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (rip to 14″ strips) | 2 | $54.98 | $109.96 |
| 1×4×8 common board (wall cleats) | 1 | $7.48 | $7.48 |
| 1-5/16″ × 8′ steel closet rod (cut into 3) | 1 | $16.98 | $16.98 |
| Closet rod flange / socket, pair | 3 | $4.48 | $13.44 |
| #8 × 1⅝″ wood screws, 1-lb box (carcass, top shelf) | 1 | $9.98 | $9.98 |
| #10 × 3″ cabinet screws, 25-pack (nailers and cleats to studs, about 21) | 1 | $9.48 | $9.48 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| Iron-on edge banding, ¾″ × 25′ (front edges) | 2 | $9.98 | $19.96 |
| Primer + paint, 1 qt each | 1 | $34.98 | $34.98 |
| Total | $227.24 |
Tools: circular saw with a straightedge guide (or table saw), drill/driver, countersink bit, stud finder, 4′ level, square, clamps, clothes iron for the banding.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
1×4 × 8′
1 board93% yieldSheet goods
- A Tower side: 2 × 84″ × 14″
- B Tower top, bottom & shelves: 6 × 22½″ × 14″
- C Kick and nailers: 3 × 22½″ × 3½″
- D Top shelf: 1 × 72″ × 14″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
The tower stands on the floor and screws to wall studs through rear nailers. The top shelf runs wall to wall on 1×4 cleats and the tower top. Double-hang on the left (two rods), long-hang on the right (a 5′ closet is all double-hang, with the tower in the right corner). Rods stay ≤48″ between supports so they don't sag.
- 1
Shopping list
Measure the closet at the floor, the middle and at 84″; walls are rarely parallel. Use the smallest number, minus ¼″, for the top shelf.
Birch or sanded pine ply paints best. Have the store rip the sheets to depth if your saw setup can't, and ask for the narrow offcuts back for the kick and nailers.
Item Qty Each Total ¾″ × 4×8 plywood, sanded (rip to 14″ strips) 2 $54.98 $109.96 1×4×8 common board (wall cleats) 1 $7.48 $7.48 1-5/16″ × 8′ steel closet rod (cut into 3) 1 $16.98 $16.98 Closet rod flange / socket, pair 3 $4.48 $13.44 #8 × 1⅝″ wood screws, 1-lb box (carcass, top shelf) 1 $9.98 $9.98 #10 × 3″ cabinet screws, 25-pack (nailers and cleats to studs, about 21) 1 $9.48 $9.48 Wood glue, 8 oz 1 $4.98 $4.98 Iron-on edge banding, ¾″ × 25′ (front edges) 2 $9.98 $19.96 Primer + paint, 1 qt each 1 $34.98 $34.98 Total $227.24 Tools: circular saw with a straightedge guide (or table saw), drill/driver, countersink bit, stud finder, 4′ level, square, clamps, clothes iron for the banding.
- 2
Cut list
Rip the sheets into 14″ strips first, then crosscut. Mark which edge is the factory edge and keep it to the front.
Tag Part Length Qty Cut A Tower side (14″ wide) 84″ 2 square B Tower top, bottom & shelves (14″ wide) 22½″ 6 square C Kick and nailers (3½″ wide) 22½″ 3 square D Top shelf (14″ wide) 72″ 1 square E Side-wall cleat 14″ 3 45° clip at the front F Back-wall cleat, left 23¼″ 1 square G Back-wall cleat, right 23¼″ 1 square R Closet rod, double-hang (steel) 23″ 2 hacksaw or tube cutter R2 Closet rod, long-hang (steel) 23″ 1 hacksaw or tube cutter Cut the top shelf last, after the tower is in, from your real wall-to-wall measurement. - 3
Build the tower carcass
Two 84″ sides, a top, a bottom set 3½″ up, and three 22½″ × 3½″ strips: a recessed toe kick at the front, nailers at the back top and back bottom.
- Glue and screw through the sides into the top, bottom and strips, three #8 screws per joint, countersunk. Pre-drill so the ply edge doesn't split.
- Work on the floor with the tower on its back.
Check: diagonals equal before the glue grabs. Rack it square and let it sit. - 4
Fixed shelves
4 shelves, 15¼″ apart. Cut a spacer block to that height and stand it on the shelf below to set each one: no measuring, and every gap matches.
Shelves sit flush with the front edge of the sides. Glue and three screws through each side.
Want adjustable shelves instead? Drill shelf-pin holes with a jig before assembly and skip the screws. - 5
Set the tower, then the wall cleats
Find and mark every stud on the back and side walls. The tower, the top shelf and the rods all hang off studs, not drywall anchors.
Stand the tower 24″ from the left wall, shim it plumb both ways, and drive two #10 × 3″ screws through each rear nailer into a stud.
Baseboard in the way? Cut out the section behind the tower (an oscillating tool does it in place) so the tower sits tight to the wall. Don't shim the top out to match; a tower leaning off the wall isn't anchored.Now the 1×4 cleats, cut to fit between the walls and the tower:
- Back-wall cleats: top edge at 84″ (flush with the tower top), level, two #10 × 3″ screws per stud.
- Side-wall cleats: top edge at 84″, level with the back cleat.
- Left side wall: a second cleat centered 40″ off the floor for the lower rod.
- Three screws per side-wall cleat. Clip the front bottom corner of each at 45° so it doesn't catch sleeves.
No stud on a side wall? Use toggle bolts rated 50 lb+ in at least three spots, or glue and screw the cleat to the corner stud. - 6
Top shelf
Measure wall to wall along the cleats, cut the top shelf ¼″ short of the tightest spot, and band its front edge.
Set the top shelf on the cleats and the tower top. Two 1⅝″ screws down into every side cleat, one every 12″ into the back cleats, and four into the tower.
Check: level the shelf front to back. A shelf that slopes forward drops sweaters on your head. - 7
Hang the rods
Rod centers 12″ from the back wall. Upper rods center at 81¾″, the lower double-hang rod at 40″.
Screw a flange to the cleat and the matching one to the tower side, both on a level line. Cut the rod ¼″ shorter than the gap so it drops in.
Cut steel rod with a tube cutter for a clean end, or hacksaw and file the burr. - 8
Done
A 6′ closet: 24″ of double-hang for shirts and folded pants, 24″ of long-hang for coats and dresses, 5 tower shelves and a full-width top shelf.
Band the front edges, fill the screw holes, prime and paint. Let the paint cure a few days before stacking sweaters on it, or they'll stick.
Add a second shelf above the long-hang rod at the same height as the upper double-hang rod later if you need more storage.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
1×4 × 8′
1 board93% yieldSheet goods
- A Tower side: 2 × 84″ × 14″
- B Tower top, bottom & shelves: 6 × 22½″ × 14″
- C Kick and nailers: 3 × 22½″ × 3½″
- D Top shelf: 1 × 72″ × 14″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
The tower stands on the floor and screws to wall studs through rear nailers. The top shelf runs wall to wall on 1×4 cleats and the tower top. Double-hang on the left (two rods), long-hang on the right (a 5′ closet is all double-hang, with the tower in the right corner). Rods stay ≤48″ between supports so they don't sag.