Shopping list
Buy sanded ¾″ plywood that is flat and has few voids in the edge: birch, or a good BC pine panel. A cleat is only as strong as its thin bevelled edge, and a void there breaks out. Skip OSB and MDF for the cleats.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (3 cleat blanks plus the holder parts) | 1 | $54.98 | $54.98 |
| #10 × 3″ washer-head cabinet screws, 25-pack (cleats to studs, 30) | 2 | $9.48 | $18.96 |
| #8 × 1⅝″ wood screws, 1-lb box (holder joints, about 69) | 1 | $9.98 | $9.98 |
| #8 × 1¼″ wood screws, 100-pack (holder cleats, 18) | 1 | $7.98 | $7.98 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| Sandpaper, 120 grit, 5-pack (ease the cleat points and edges) | 1 | $5.98 | $5.98 |
| Total | $102.86 |
Tools: table saw (or a circular saw that tilts to 45°, with a straightedge guide), drill/driver, countersink bit, ⅜″ and ½″ drill bits for the rack, stud finder, 4′ level, tape, square, clamps.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Sheet goods
- A Wall cleat: 6 × 72″ × 2¾″
- B Holder cleat, shelves and racks: 3 × 16″ × 2¾″
- C Holder cleat, bins: 2 × 12″ × 2¾″
- D Shelf back: 2 × 16″ × 8″
- E Shelf: 2 × 14½″ × 6″
- F Shelf end: 4 × 6″ × 6″
- G Bin back: 2 × 12″ × 8″
- H Bin front: 2 × 12″ × 4″
- J Bin side: 4 × 5″ × 5″
- K Bin bottom: 2 × 10½″ × 5″
- L Rack back: 1 × 16″ × 6″
- M Rack ledge: 1 × 16″ × 3″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Every cleat is the same 2¾″ strip with a 45° bevel: on the wall the point goes up and out, on a holder it goes down and back, and the two hook together under the holder's own weight. The drawing puts the top cleat 6′ 6″ off the floor and assumes studs 16″ on center; find your own studs and move the field to suit. Figure about 25 lb for a shelf or bin and 10 lb for a tool rack as built here.
- 1
Shopping list
Buy sanded ¾″ plywood that is flat and has few voids in the edge: birch, or a good BC pine panel. A cleat is only as strong as its thin bevelled edge, and a void there breaks out. Skip OSB and MDF for the cleats.
Item Qty Each Total ¾″ × 4×8 plywood, sanded (3 cleat blanks plus the holder parts) 1 $54.98 $54.98 #10 × 3″ washer-head cabinet screws, 25-pack (cleats to studs, 30) 2 $9.48 $18.96 #8 × 1⅝″ wood screws, 1-lb box (holder joints, about 69) 1 $9.98 $9.98 #8 × 1¼″ wood screws, 100-pack (holder cleats, 18) 1 $7.98 $7.98 Wood glue, 8 oz 1 $4.98 $4.98 Sandpaper, 120 grit, 5-pack (ease the cleat points and edges) 1 $5.98 $5.98 Total $102.86 Tools: table saw (or a circular saw that tilts to 45°, with a straightedge guide), drill/driver, countersink bit, ⅜″ and ½″ drill bits for the rack, stud finder, 4′ level, tape, square, clamps.
- 2
Cut list
Cleats first. Rip 3 blanks 5″ wide off the full 8′ length of the sheet. Tilt the blade to 45°, set the fence so the cut runs down the middle of a blank, and rip each blank into two identical strips: 2¾″ on the long face, 2″ on the short face. That makes 6 strips; you need 6. Then crosscut the strips to the lengths below.
Run a test blank from scrap first and flip one half onto the other: if the two don't match, nudge the fence. Exact width matters less than every strip being the same.
Tag Part Length Qty Cut A Wall cleat (2¾″ wide) 72″ 6 from the bevel-ripped strips; 45° along one edge B Holder cleat, shelves and racks (2¾″ wide) 16″ 3 from the bevel-ripped strips C Holder cleat, bins (2¾″ wide) 12″ 2 from the bevel-ripped strips D Shelf back (8″ wide) 16″ 2 square E Shelf (6″ wide) 14½″ 2 square F Shelf end (6″ wide) 6″ 4 square; clip the top front corner if you like G Bin back (8″ wide) 12″ 2 square H Bin front (4″ wide) 12″ 2 square J Bin side (5″ wide) 5″ 4 square K Bin bottom (5″ wide) 10½″ 2 square L Rack back (6″ wide) 16″ 1 square M Rack ledge (3″ wide) 16″ 1 drill after cutting, see the rack step One way to get everything out of 1 sheet: rip these strips off the 8′ length, then crosscut each one. They add up to 33¾″ of the 48″ across, saw kerfs included.
Rip width Strips Crosscut into 8″ 1 2 × shelf back, 2 × bin back, 1 × rack back, 1 × shelf, 1 × shelf end 6″ 1 1 × shelf, 3 × shelf end, 2 × bin bottom, 4 × bin side, 1 × bin front 5″ 3 3 × cleat blank 4″ 1 1 × bin front, 1 × rack ledge Narrower parts ride in the tail of a wider strip: crosscut the piece off, then rip it to its own width.A bevel rip leaves a knife edge. Knock ⅛″ off every point with the sanding block so it can't splinter or cut you; the cleats still seat fully. - 3
Find the studs, strike the lines
The cleats hang on the wall framing, never on drywall anchors. Find every stud across the width with a stud finder, confirm each with a finish nail where a cleat will cover the hole, and draw a plumb line down the center of each one.
Studs are normally 16″ on center. A 6′ cleat should catch 5 of them; it can run up to 8″ past the last stud at each end, no more.
- Mark the bottom edge of the first cleat 35¼″ off the floor (as drawn; move the whole field up or down to suit) and strike a level line through it with the 4′ level. Don't measure off the floor at both ends: garage slabs slope.
- Tick the bottom edges of the remaining 5 cleats on two of the stud lines, each 8″ above the last: 6 cleats in all, the top one finishing 78″ off the floor.
Wires and pipes run through studs. A 3″ screw through ¾″ ply and ½″ drywall goes 1¾″ into the stud; stay on the stud centerline and well clear of switches, outlets and anything plumbed directly above or below. - 4
Hang the first cleat
Take a 72″ wall cleat and hold it with its short face against the wall and the point up: the bevel slopes down toward the drywall, leaving a V pocket between the cleat and the wall. Get this backwards and nothing will hang.
- Set the bottom edge on the level line.
- Pre-drill and countersink at each stud line, 1¼″ up from the bottom edge, and drive one #10 × 3″ screw per stud: 5 in this cleat. Start at one end, re-check level, then do the rest.
- Snug, not buried: a washer-head screw pulls the ply tight to the drywall without crushing through the face veneer.
Check: level across the top and tight to the wall along its whole length. If the wall bows away, shim behind the cleat at that stud rather than pulling the cleat into the hollow. - 5
Hang the rest of the cleats
5 more, same way up, bottom edges on your ticks: 8″ from one cleat to the next, which leaves a 5¼″ gap. One screw per stud in every cleat, 30 screws for the wall.
A holder needs ¾″ of lift to unhook. Its cleat stands 2″ above the point it hangs on, so the 5¼″ gap leaves 3¼″ of headroom above it. Don't close the spacing up.
Faster than measuring: cut two spacers 6″ long from scrap with a 45° bevel on one end. Seat the bevelled ends in the pocket of the cleat below, rest the next cleat on top, and screw it off.Check: every few cleats, put the level on one. Small errors stack. - 6
Build the 2 shelves
Each shelf is a 16″ × 8″ back, a 14½″ × 6″ shelf board between two 6″ × 6″ ends, and a 16″ holder cleat. Build them all the same.
- Glue and screw the ends to the shelf board: two #8 × 1⅝″ screws through each end into the end grain of the shelf, bottoms flush. Pre-drill every screw; ply edges split.
- Glue and screw the back on from behind: its bottom edge flush with the underside of the shelf, four screws into the shelf and three into each end.
- Glue the holder cleat to the back of the back, flush with the top edge, short face on the back, point down and away from it. Clamp it and drive four #8 × 1¼″ screws from the inside of the shelf, through the back into the cleat.
Let the glue set, then drop it on a wall cleat: the point slides into the pocket and the back comes to rest flat against the face of the wall cleat.
Check: push down on the front edge. The shelf should not rock or lift at the back. If it does, the holder cleat is upside down or not seated. - 7
Build the 2 bins
A bin is a 12″ × 8″ back, two 5″ × 5″ sides, a 10½″ × 5″ bottom between them, a 4″ front, and a 12″ holder cleat. Cut and build all 2 as a batch.
- Glue and screw the sides to the ends of the bottom, two #8 × 1⅝″ screws each, bottoms flush.
- Add the back from behind (two screws into each side, three into the bottom), bottom edges flush.
- Add the front across the sides and bottom the same way. It is 1″ lower than the sides so you can see in and reach in.
- Glue and screw the 12″ holder cleat to the back, flush with the top, short face on the back and point down, with three #8 × 1¼″ screws from inside the bin.
Bins are for loose, light, grabbable things: tape, gloves, rags, spray cans. Boxes of screws and nails add up fast; put those on a shelf close to the wall, or split them between bins. - 8
Build the tool rack
A 16″ × 6″ back with a 16″ × 3″ ledge across the top, drilled for screwdrivers, and a 16″ holder cleat.
- Lay out the ledge: a row of holes on a line 1½″ in from the front edge, 2½″ apart, starting 1¾″ from the end. That's six. Drill ⅜″ for screwdrivers and nut drivers, ½″ for fatter shanks; back the ledge with scrap so the bit doesn't blow out the underside.
- For chisels, pliers or files, saw a slot in from the front edge to a hole instead, so the tool slides in sideways.
- Glue the back edge of the ledge to the face of the back, top edges flush, and drive five #8 × 1⅝″ screws through the back into the ledge.
- Now glue the holder cleat on over those screw heads, flush with the top, short face on the back and point down. Four #8 × 1¼″ screws through the back into the cleat, driven from the front below the ledge.
Hang a rack where the stretch of cleat above it is empty, as drawn: a screwdriver has to lift its whole shank out of the hole, about 7″, before it comes free.
The ledge is a 3″ shelf held by glue and screws into its edge: fine for hand tools, about 10 lb. It is not a place for a framing hammer collection. - 9
Done
A 6′ × 42¾″ cleat wall with 2 shelves, 2 bins and 1 tool rack. Lift any of them ¾″ and it comes off; set it down anywhere along any cleat.
- Loads: about 25 lb per shelf or bin and 10 lb per tool rack as built. The wall cleats, with a 3″ screw in every stud, carry far more than that; the limit is each holder's own joints and how far its load sits off the wall.
- Keep weight close to the wall and heavy things low. Nothing here is meant to be climbed on or pulled on.
- A holder only hooks over ¾″ of bevel: lifted or bumped from below, it comes off. Don't hang anything over a spot where that would matter, and keep sharp and heavy tools below head height.
A coat of water-based polyurethane keeps the ply clean. Keep finish off the mating bevels or let it cure hard for a week first, or the holders stick.
Every new holder is the same recipe: a back at least 5″ tall, whatever you like on the front, and an offcut of cleat strip glued and screwed across the top. Save the leftover strip for that.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Sheet goods
- A Wall cleat: 6 × 72″ × 2¾″
- B Holder cleat, shelves and racks: 3 × 16″ × 2¾″
- C Holder cleat, bins: 2 × 12″ × 2¾″
- D Shelf back: 2 × 16″ × 8″
- E Shelf: 2 × 14½″ × 6″
- F Shelf end: 4 × 6″ × 6″
- G Bin back: 2 × 12″ × 8″
- H Bin front: 2 × 12″ × 4″
- J Bin side: 4 × 5″ × 5″
- K Bin bottom: 2 × 10½″ × 5″
- L Rack back: 1 × 16″ × 6″
- M Rack ledge: 1 × 16″ × 3″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
Every cleat is the same 2¾″ strip with a 45° bevel: on the wall the point goes up and out, on a holder it goes down and back, and the two hook together under the holder's own weight. The drawing puts the top cleat 6′ 6″ off the floor and assumes studs 16″ on center; find your own studs and move the field to suit. Figure about 25 lb for a shelf or bin and 10 lb for a tool rack as built here.