Garage Wall Cabinet Builder
Shopping list
Sanded ¾″ plywood for the box, shelves and doors: birch, or a flat BC pine panel. Sight down the sheet before you buy; a bowed sheet makes bowed doors. The back is a ½″ 4×4 project panel, which is all this cabinet needs.
| Item | Qty | Each | Total |
|---|---|---|---|
| ¾″ × 4×8 plywood, sanded (box, rails, shelves, doors) | 1 | $54.98 | $54.98 |
| ½″ × 4×4 plywood project panel (back, 30″ × 30″) | 1 | $26.98 | $26.98 |
| ¼″ × 3½″ washer-head structural screws (cabinet to studs: 2 per stud in the top rail, 1 in the bottom) | 6 | $0.98 | $5.88 |
| #8 × 2″ wood screws, 1-lb box (box and rails, 28) | 1 | $10.98 | $10.98 |
| #8 × 1¼″ wood screws, 100-pack (back, about 28) | 1 | $7.98 | $7.98 |
| Wood glue, 8 oz | 1 | $4.98 | $4.98 |
| ¼″ shelf pins, 16-pack (8 needed) | 1 | $3.98 | $3.98 |
| Full-overlay frameless cup hinges, 35 mm, soft-close, 2-pack (2 per door, screws included) | 2 | $6.98 | $13.96 |
| Cabinet pull, 3″ centers | 2 | $3.48 | $6.96 |
| Water-based polyurethane, 1 qt | 1 | $19.98 | $19.98 |
| Total | $156.66 |
Tools: circular saw with a straightedge guide (or table saw), drill/driver, ⅛″ pilot bit and countersink, ¼″ bit with a depth stop, 3⁄16″ bit, 35 mm Forstner bit for the hinge cups, a scrap of ¼″ pegboard (shelf-pin template), stud finder, 4′ level, square, clamps, a straight 2×4 offcut for a temporary ledger, and a helper for the lift.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Sheet goods
- A Side: 2 × 30″ × 11½″
- B Top and bottom: 2 × 28½″ × 11½″
- C Hanging rail: 2 × 28½″ × 4″
- D Shelf: 2 × 28⅜″ × 11¼″
- E Door: 2 × 29¾″ × 14⅞″
- F Back, ½″ ply: 1 × 30″ × 30″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
A ¾″ plywood box, glued and screwed, with a ½″ back glued on to keep it square and two 4″ hanging rails inside. It hangs from structural screws through the rails into at least two wall studs, never from drywall anchors. The drawing puts the underside 54″ off the floor and assumes studs 16″ on center; find your own studs first. Shelf loads are set by sag, not by the screws: see the last step.
- 1
Shopping list
Sanded ¾″ plywood for the box, shelves and doors: birch, or a flat BC pine panel. Sight down the sheet before you buy; a bowed sheet makes bowed doors. The back is a ½″ 4×4 project panel, which is all this cabinet needs.
Item Qty Each Total ¾″ × 4×8 plywood, sanded (box, rails, shelves, doors) 1 $54.98 $54.98 ½″ × 4×4 plywood project panel (back, 30″ × 30″) 1 $26.98 $26.98 ¼″ × 3½″ washer-head structural screws (cabinet to studs: 2 per stud in the top rail, 1 in the bottom) 6 $0.98 $5.88 #8 × 2″ wood screws, 1-lb box (box and rails, 28) 1 $10.98 $10.98 #8 × 1¼″ wood screws, 100-pack (back, about 28) 1 $7.98 $7.98 Wood glue, 8 oz 1 $4.98 $4.98 ¼″ shelf pins, 16-pack (8 needed) 1 $3.98 $3.98 Full-overlay frameless cup hinges, 35 mm, soft-close, 2-pack (2 per door, screws included) 2 $6.98 $13.96 Cabinet pull, 3″ centers 2 $3.48 $6.96 Water-based polyurethane, 1 qt 1 $19.98 $19.98 Total $156.66 Tools: circular saw with a straightedge guide (or table saw), drill/driver, ⅛″ pilot bit and countersink, ¼″ bit with a depth stop, 3⁄16″ bit, 35 mm Forstner bit for the hinge cups, a scrap of ¼″ pegboard (shelf-pin template), stud finder, 4′ level, square, clamps, a straight 2×4 offcut for a temporary ledger, and a helper for the lift.
- 2
Cut list
The sides, top and bottom are all 11½″ wide. Cut that width at one fence setting for all four and the box comes out flush front and back. A layout for the sheet follows the list.
The back is the only ½″ part. Cut it dead square: it is what squares the cabinet.
Tag Part Length Qty Cut A Side (11½″ wide) 30″ 2 square B Top and bottom (11½″ wide) 28½″ 2 square C Hanging rail (4″ wide) 28½″ 2 square D Shelf (11¼″ wide) 28⅜″ 2 square E Door (14⅞″ wide) 29¾″ 2 both from one strip so the grain matches F Back, ½″ ply (30″ wide) 30″ 1 from the ½″ panel, square One way to get the ¾″ parts out of 1 sheet: rip these strips off the 8′ length, then crosscut each one. The widths add up to 38″ of the 48″ available, saw kerfs included.
Rip width Strips Cut into 14⅞″ 1 2 × door, 1 × side 11½″ 1 1 × side, 2 × top / bottom 11¼″ 1 2 × shelf, 2 × hanging rail A part narrower than the piece it comes out of gets cut free first, then sawn to its own width. - 3
Drill the sides, build the box
Shelf-pin holes first, while the sides are loose and flat. Clamp a scrap of pegboard to the inside face of a side, flush with its front and bottom edges, and drill ¼″ holes ⅜″ deep through the pegboard holes: one column 2″ in from the front edge, one 2″ in from the back edge, every 2″ (every other pegboard hole) from 5″ above the bottom edge to 5″ below the top edge. Use a depth stop; the side is only ¾″ thick.
Flip the pegboard for the second side so the two are mirror images, registered off the same bottom edge. If the columns don't match, the shelves rock.
Now the box: the top and bottom (28½″) go between the sides, all four flush at the front and back.
- Spread glue on one end of the bottom, stand a side against it, flush, and drive 3 #8 × 2″ screws through the side into the end of the bottom. Pre-drill ⅛″ and countersink every one; plywood edges split.
- Same at the top, then roll the box over and do the other side.
- Pin-hole faces in, and both sides the same way up.
Have a pocket-hole jig? Put the pockets on the top of the top and the underside of the bottom, three or four per end, and use 1¼″ coarse pocket screws with glue. No screw heads show on the sides. - 4
Hanging rails
Two 28½″ × 4″ rails stand between the sides at the back of the box: one tight up under the top, one tight down on the bottom, rear faces flush with the rear edges of the box. These are what the wall screws go through, so they get glue on every mating edge.
- Glue the top rail's ends and top edge, clamp it in place, and drive two #8 × 2″ screws through each side into its ends.
- Drive 4 more down through the top panel into the rail's edge, about every 8″, ⅜″ in from the rear edge so they land in the middle of the rail's ¾″ thickness.
- Bottom rail the same way, screwed up through the bottom panel.
Don't skip the bottom rail. It holds the bottom of the box to the wall and carries the back edge of the bottom panel, where the heavy things end up. - 5
Glue on the back
Lay the box face down. The ½″ back (30″ × 30″) covers the whole rear, flush with the outside all round.
- Measure the box corner to corner both ways. Push the long diagonal until the two match.
- Run a bead of glue along every rear edge and both rails.
- Set the back on, line up one long edge and one corner, and drive #8 × 1¼″ screws every 6″ around the edge and a row into each rail. Start at the lined-up corner and pull the box to the back's square corner as you go.
Check: diagonals again before the glue sets. A racked box means doors that never line up. The glued back is also most of the cabinet's strength: it ties the sides, top and bottom to the rails. - 6
Hang it on the studs
The box weighs about 35 lb without shelves and doors. Hang it empty, with a helper.
- Find the studs and mark their centerlines above and below where the cabinet goes. You need two studs inside the 30″ width. If only one lands there, move the cabinet.
- Strike a level line for the underside (54″ off the floor as drawn, 18″ above a 36″ bench) and screw a straight 2×4 offcut to the studs with its top edge on the line. This temporary ledger carries the weight while you work.
- Measure from where the cabinet's side will sit to each stud line and transfer those to the inside of both rails. Drill 3⁄16″ clearance holes through rail and back: two per stud in the top rail, 1″ in from each edge of the rail, and one per stud in the middle of the bottom rail.
- Lift the cabinet onto the ledger, slide it to position, check the front edge for plumb, and drive the six ¼″ × 3½″ structural screws. Snug, not crushed.
- Take the ledger off and fill its screw holes.
Studs only. A 3½″ screw goes through ¾″ of rail, ½″ of back and ½″ of drywall and still gets 1¾″ of thread into the stud. Drywall anchors, toggles and screws that miss the stud will let go under a loaded cabinet.Wall not flat? Shim behind the rail at the stud before tightening. Pulling the cabinet into a hollow twists the box and the doors won't close flat. - 7
Set the 2 shelves
Four ¼″ pins per shelf, all at the same hole count from the bottom, then drop the shelf on. Evenly spaced gives 3 openings of about 9″; use the nearest holes, or move them to suit what you store.
Shelves are 28⅜″ × 11¼″: ⅛″ shorter than the opening so they lift out, and ¼″ back from the front edge so the doors close.
Load: about 45 lb per shelf, spread out. That keeps a 28½″ span of ¾″ ply from sagging visibly over time. Heavier things go on the bottom. - 8
Hang the doors
Two 14⅞″ × 29¾″ slab doors cover the whole front, with a ⅛″ gap between them and ⅛″ showing at the top and bottom.
- On the back of each door, mark hinge centers 3½″ from the top and bottom. Bore the 35 mm cups ½″ deep with the Forstner bit, centered ⅞″ in from the hinge-side edge (check the sheet that comes with your hinges; brands differ by a millimeter or two). Use a depth stop: the door is ¾″ thick.
- Press the hinges into the cups, square them to the door edge, and screw them down.
- Screw the mounting plates to the inside of the cabinet sides at the same heights, on a line 1½″ (37 mm) back from the front edge.
- Clip the doors on. Turn the hinge adjusting screws to even up the gaps: one moves the door side to side, one in and out, and the plate slots move it up and down.
- Pulls: drill through from the face on a line 2″ in from the meeting edge, the lower hole 3½″ up from the bottom of the door and the upper one 3″ above it, with a scrap clamped behind to stop tear-out.
Finish both faces of each door the same. A door sealed on one side only cups as the garage humidity swings. - 9
Done
A 30″ × 30″ × 12″ wall cabinet with 2 adjustable shelves and two doors, about 55 lb empty.
- Shelves: about 45 lb each, spread across the shelf, not stacked in the middle.
- Whole cabinet: keep the contents under 150 lb. That assumes all six structural screws are in solid studs.
- Heaviest things on the bottom, which is fixed and backed by the rail. Gallons of paint weigh 11 lb each: count them.
- It is a cabinet, not a step or a chin-up bar. Don't hang anything from the doors or the underside.
Re-check the wall screws after the first month of loading. If one turns without tightening, it missed the stud: move it over ¾″ and drive a new one.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
Sheet goods
- A Side: 2 × 30″ × 11½″
- B Top and bottom: 2 × 28½″ × 11½″
- C Hanging rail: 2 × 28½″ × 4″
- D Shelf: 2 × 28⅜″ × 11¼″
- E Door: 2 × 29¾″ × 14⅞″
- F Back, ½″ ply: 1 × 30″ × 30″
Rip sheet parts on a table saw or with a circular saw and a straightedge; most stores will make the first rips for free.
A ¾″ plywood box, glued and screwed, with a ½″ back glued on to keep it square and two 4″ hanging rails inside. It hangs from structural screws through the rails into at least two wall studs, never from drywall anchors. The drawing puts the underside 54″ off the floor and assumes studs 16″ on center; find your own studs first. Shelf loads are set by sag, not by the screws: see the last step.