Porch Swing Frame Builder
Shopping list
All ground-contact pressure-treated. The beam boards are the ones that matter: sight down the pile and take the two straightest, with the fewest knots near the middle. Crown both up when you laminate them.
The swing itself isn't on the list; this frame takes any 4′ or 5′ porch swing with a chain or rope hanging kit.
| Item | Qty | Each | Total |
|---|---|---|---|
| 4×4×8 pressure-treated (legs) | 4 | $12.98 | $51.92 |
| 2×6×10 pressure-treated (beam) | 2 | $12.80 | $25.60 |
| 2×6×8 pressure-treated (collar and ground ties) | 3 | $9.48 | $28.44 |
| 2×4×8 pressure-treated (knee braces) | 1 | $5.98 | $5.98 |
| ½″ × 8″ galvanized carriage bolt, nut & 2 washers (collar ties) | 8 | $3.48 | $27.84 |
| ½″ × 6″ galvanized carriage bolt, nut & 2 washers (ground ties) | 4 | $2.68 | $10.72 |
| 5/16″ × 3½″ structural wood screws, 12-pack (knee braces (16)) | 2 | $13.98 | $27.96 |
| 5/16″ × 6″ structural wood screw (toe-screw leg tops into the beam) | 8 | $1.98 | $15.84 |
| 2½″ exterior screws, 1-lb box (laminating the beam (3″ would poke through)) | 1 | $10.98 | $10.98 |
| Exterior construction adhesive, 10 oz | 1 | $6.48 | $6.48 |
| 1¼″ × 12″ galvanized strap tie, with 1½″ strap-tie nails (beam to apex) | 4 | $2.48 | $9.92 |
| ½″ × 8″ forged eye bolt, nut & washers (swing rated) | 2 | $9.98 | $19.96 |
| Porch swing hanging kit (chain, S-hooks, quick links) | 1 | $39.98 | $39.98 |
| 15″ auger ground anchor (one per foot) | 4 | $8.98 | $35.92 |
| Total | $317.54 |
Tools: circular saw with a speed square (20° and 45°), drill/driver, ½″ × 12″ auger bit, ¾″ socket, 4′ level, clamps, a stepladder and a helper.
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 8′
4 boards95% yield2×6 × 8′
3 boards71% yield2×6 × 10′
2 boards88% yield2×4 × 8′
1 board83% yieldLegs lean 20° off plumb front-to-back and meet in a level apex under the beam. Collar ties and a low ground tie lock each A; four 45° knee braces stop the beam racking side to side. Rated for two adults (about 500 lb) when built as drawn.
- 1
Shopping list
All ground-contact pressure-treated. The beam boards are the ones that matter: sight down the pile and take the two straightest, with the fewest knots near the middle. Crown both up when you laminate them.
The swing itself isn't on the list; this frame takes any 4′ or 5′ porch swing with a chain or rope hanging kit.
Item Qty Each Total 4×4×8 pressure-treated (legs) 4 $12.98 $51.92 2×6×10 pressure-treated (beam) 2 $12.80 $25.60 2×6×8 pressure-treated (collar and ground ties) 3 $9.48 $28.44 2×4×8 pressure-treated (knee braces) 1 $5.98 $5.98 ½″ × 8″ galvanized carriage bolt, nut & 2 washers (collar ties) 8 $3.48 $27.84 ½″ × 6″ galvanized carriage bolt, nut & 2 washers (ground ties) 4 $2.68 $10.72 5/16″ × 3½″ structural wood screws, 12-pack (knee braces (16)) 2 $13.98 $27.96 5/16″ × 6″ structural wood screw (toe-screw leg tops into the beam) 8 $1.98 $15.84 2½″ exterior screws, 1-lb box (laminating the beam (3″ would poke through)) 1 $10.98 $10.98 Exterior construction adhesive, 10 oz 1 $6.48 $6.48 1¼″ × 12″ galvanized strap tie, with 1½″ strap-tie nails (beam to apex) 4 $2.48 $9.92 ½″ × 8″ forged eye bolt, nut & washers (swing rated) 2 $9.98 $19.96 Porch swing hanging kit (chain, S-hooks, quick links) 1 $39.98 $39.98 15″ auger ground anchor (one per foot) 4 $8.98 $35.92 Total $317.54 Tools: circular saw with a speed square (20° and 45°), drill/driver, ½″ × 12″ auger bit, ¾″ socket, 4′ level, clamps, a stepladder and a helper.
- 2
Cut list
Legs get a 20° cut on both ends, parallel: the top becomes the level apex under the beam, the foot sits flat. 91¼″ is long point to long point.
Tag Part Length Qty Cut L Leg 91¼″ 4 20° both ends, parallel B Beam ply (doubled) 106″ 2 square (or 45° clipped ends) C Collar tie 19⅜″ 4 20° both ends, mirrored (long edge at the bottom) G Ground tie 63⅞″ 2 20° both ends, mirrored (long edge at the bottom) K Knee brace 19¾″ 4 45° plumb + 45° level (long point) Cut one leg, stand a pair in an A on the driveway, and check the apex is level before cutting the other three to match. - 3
Build the two A-frames
Lay two legs on the driveway, apex cuts touching, feet 65¼″ apart center to center. The two apex cuts should form one level 7½″ seat for the beam.
- Clamp a collar tie across both legs, top edge 8¾″ below the apex. Flip the frame and clamp the second one opposite it.
- Drill ½″ through tie, leg, tie, and drive two carriage bolts per leg, staggered.
- Build the second A right on top of the first so they match exactly.
Check: lay a level across the apex. If it isn't flat, plane the high leg now. The beam rests here. - 4
Ground ties
A 2×6 across the outside face of each A, 9″ off the ground. It keeps the feet from spreading when the swing loads the frame. One ½″ × 6″ carriage bolt through tie and leg at each end, centered on the leg.
Screw an auger anchor bracket to each foot now (Step 8 drives them).
- 5
Laminate and set the beam
Run a bead of adhesive between the two 106″ beam boards, crowns up, ends flush, and screw them together with 2½″ screws every 12″ from both sides, staggered.
- Stand both A-frames with a helper, ground ties facing out, and tack a temporary 2×4 diagonal from each A to a stake.
- Lift the beam onto the apexes so 88″ sits between the legs' inside faces and the ends overhang equally.
- Pre-drill and drive two 6″ structural screws per leg, angled up through the leg's outer face just below the apex into the beam. Then nail a strap tie on each face: down the beam face, across the leg top, and down the leg.
Two people minimum, three is better. The beam is heavy and awkward at head height. - 6
Knee braces
Two 45° braces at each end, side by side under the beam: the plumb end sits against the middle of the inside collar tie, the level end tight under the beam, 11½″ in from the tie. They stop well short of the eye bolts so the chains swing clear.
Two 3½″ structural screws through each end, pre-drilled at an angle into the collar tie and up into the beam. These are what stop the frame racking side to side as the swing moves, so make them tight.
Check: the legs are plumb side to side (level on the inside face) before the braces go in. Pull the temporary braces once all four are on. - 7
Eye bolts and swing
Drill ½″ straight down through the beam on the glue line, 48½″ apart (24¼″ each side of the beam's center), a hair wider than the swing. Push the forged eye bolts up from below and fit a washer wide enough to bear on both beam boards, then double nuts, on top.
Drive two extra 2½″ laminating screws from each side within 3″ of each eye bolt so the boards can't spread at the hole.
Hang the chain kit and adjust so the seat is level and about 18″ off the ground, back links slightly shorter than front so it tips back a little.
Use forged eye bolts or swing hangers rated for at least 500 lb each. Bent-wire eye bolts open up under swing loads. - 8
Done
A 4′ swing frame with a 7′ 6″ beam. Drive the four auger anchors and bolt them to the feet; a swinging load walks an unanchored frame across the lawn.
Set it on level ground, or on 12″ pavers under each foot. Re-snug the bolts after the first month as the PT dries, then seal it.
Check the eye bolts and chain links every spring. Replace anything worn shiny or bent.
Cut diagram
Every cut laid onto standard boards, longest first, with a ⅛″ saw kerf between pieces. Hatched space at the end of a board is offcut, and ×3 means cut three boards the same way. Use this at the saw to cut one board at a time.
4×4 × 8′
4 boards95% yield2×6 × 8′
3 boards71% yield2×6 × 10′
2 boards88% yield2×4 × 8′
1 board83% yieldLegs lean 20° off plumb front-to-back and meet in a level apex under the beam. Collar ties and a low ground tie lock each A; four 45° knee braces stop the beam racking side to side. Rated for two adults (about 500 lb) when built as drawn.